The Ramona Projects also spans across 8 different school sites in the Ramona School district. Totaling 1.46 Megawatts with 3366 panels, and 81 posts installed. This was a DSA approved system, adhering to all special inspections and guidelines. This system will help offset the energy needs, and lower electric bills for the district for years to come, putting money back into the school’s education providing a better brighter future.
Request a Proposal for Your Engineered Structural Solar Project
A solar system can generate power flawlessly for four years. Then it fails in year five. Not because the panels wore out. Because the steel underneath them was never built for the load it was carrying. Your site has the space. Your business has the