The Ramona Projects also spans across 8 different school sites in the Ramona School district. Totaling 1.46 Megawatts with 3366 panels, and 81 posts installed. This was a DSA approved system, adhering to all special inspections and guidelines. This system will help offset the energy needs, and lower electric bills for the district for years to come, putting money back into the school’s education providing a better brighter future.