[ngg src="galleries" ids="6" display="basic_slideshow"]The Ramona Projects also spans across 8 different school sites in the Ramona School district. Totaling 1.46 Megawatts with 3366 panels, and 81 posts installed. This was a DSA approved system, adhering to all special inspections and guidelines. This system will help...

[ngg src="galleries" ids="10" display="basic_slideshow"]The St. Catherine of Alexandria church was provided with a phenomenal 10 post, 312 panel, 112,320 KW, light gauge system that was installed in just 2 weeks time. These light gauge systems are a great and cost effective way to provide shade...

[ngg src="galleries" ids="4" display="basic_slideshow"]The San Marcos ground mount system for the Vallecitos Water district spans across two sites with nearly six thousand panels installed totaling 2.129 MW worth of renewable solar energy for the district. This is a ballasted system that sits on top of...